So you have no problem with a fuse rated at twice the current rating on a transformer wound for 60hz and 110V being put on 240V? That is not Engineering by any stretch. With say 1 sq mm mains cable should take 10A your 110V fuse on a 60W iron is going to be 0.75 or 1A sure the cable is safe but are the windings? In the case of it having a 1A fitted your well over 200% and more like 300% power at the windings before the fuse goes.

The current rating of the fuse should match the current rating of the wire in the transformer.

Voltage doesn't enter into it.

 

Offline paschulke2

  • Contributor
  • Posts: 40
  • Country: de
Re: EEVblog #1160 - Weller Responds
« Reply #76 on: December 18, 2018, 03:01:27 pm »
So, TL;DR: Weller US branch moved operations to Mexico, probably laid off all US engineering staff. Weller German offices probably existed prior to this move and continued to exist to be able to sell Weller products to the European market. Their offices there designed new units for the European market, and those were ported to the US market slowly. Eventually someone high up decided to hand the reigns of the US Weller branch more or less fully over to the German branch.

Weller was founded in 1959 in Besigheim, Germany. It never was only an "office". Weller soldering tools were developed and (at least for the european market) manufactured in Besigheim, Germany until 2016, when manufacturing was moved to Mexico and 130 people were laid off. Weller claim that they still develop the soldering tools in Besigheim, Germany.

BTW: my 2014 Weller PU81 was made in Germany and has a 500mA slow blow primary fuse which is user-accessible. I bought another one last year, which was "Made in Mexico".
« Last Edit: December 18, 2018, 03:03:08 pm by paschulke2 »
 
The following users thanked this post: oPossum, nsd_c

Offline sonic

  • Regular Contributor
  • *
  • Posts: 59
  • Country: de
    • Homepage
Re: EEVblog #1160 - Weller Responds
« Reply #77 on: December 18, 2018, 03:24:11 pm »
I regret owning a Weller WSM 1. While going into standby during usage again and again, look what it did hours/days (/months? I have no idea!) after being switched off:



It kept heating all the time! Their support didn't even replace the surely burnt very expensive tip >:(
« Last Edit: December 18, 2018, 03:46:02 pm by sonic »
 

Online Fungus

  • Super Contributor
  • ***
  • Posts: 16560
  • Country: 00
Re: EEVblog #1160 - Weller Responds
« Reply #78 on: December 18, 2018, 03:33:07 pm »
Seems like a very deliberate choice.

Definitely not an "oversight", they chose to leave it out.

(probably to save ten cents)
 

Offline SiliconWizard

  • Super Contributor
  • ***
  • Posts: 14297
  • Country: fr
Re: EEVblog #1160 - Weller Responds
« Reply #79 on: December 18, 2018, 04:06:28 pm »
Weller seeming a reputable company, their reply is not just hilarious, this is also very disappointing.

We can understand they probably got trapped because giving a technical explanation would have led to potential backfiring. They certainly know they are (at the very least) borderline on this, and as long as they don't get sued, they will probably opt for polite silence, as they just did, instead of trying to justify themselves.
 

Offline SiliconWizard

  • Super Contributor
  • ***
  • Posts: 14297
  • Country: fr
Re: EEVblog #1160 - Weller Responds
« Reply #80 on: December 18, 2018, 04:11:32 pm »
Seems like a very deliberate choice.

Definitely not an "oversight", they chose to leave it out.

(probably to save ten cents)

Agree on this being deliberate, but they are probably saving more than ten cents.
As their secondary protections are hand-mounted, "flying" stuff, they chose not to put those on a PCB with better mounting.
At the primary side, they would have had to use either a mains socket with a built-in fuse holder (which are significantly more expensive) or mount the fuse holder properly (a primary side fuse on flying wires... yuck!) with maybe a total added cost of a few dollars if you count parts and added labor...
 

Offline PA0PBZ

  • Super Contributor
  • ***
  • Posts: 5121
  • Country: nl
Re: EEVblog #1160 - Weller Responds
« Reply #81 on: December 18, 2018, 04:23:39 pm »
I have a WES81 230V version and it has a IEC power connector with integrated fuse. So do they only use a primary fuse on the 80 watt model and not on the 50W? Or do they only use a fuse on the 230V model and not on the 110V? Is it only fused for the EU market?  :-//
Keyboard error: Press F1 to continue.
 

Online Fungus

  • Super Contributor
  • ***
  • Posts: 16560
  • Country: 00
Re: EEVblog #1160 - Weller Responds
« Reply #82 on: December 18, 2018, 04:34:16 pm »
Definitely not an "oversight", they chose to leave it out.

(probably to save ten cents)

Agree on this being deliberate, but they are probably saving more than ten cents.
As their secondary protections are hand-mounted, "flying" stuff, they chose not to put those on a PCB with better mounting.
At the primary side, they would have had to use either a mains socket with a built-in fuse holder (which are significantly more expensive) or mount the fuse holder properly (a primary side fuse on flying wires... yuck!) with maybe a total added cost of a few dollars if you count parts and added labor...

These don't cost much more and require zero extra labor to install:



« Last Edit: December 18, 2018, 04:40:19 pm by Fungus »
 

Offline Cnoob

  • Regular Contributor
  • *
  • Posts: 132
  • Country: gb
Re: EEVblog #1160 - Weller Responds
« Reply #83 on: December 18, 2018, 04:39:33 pm »
@Fungus

My pace wjs 100 has one of those as well as a long good quality mains cable.
Just to the pace also came with a European mains cable which I put a uk plug on.
« Last Edit: December 18, 2018, 04:42:18 pm by Cnoob »
 

Offline SiliconWizard

  • Super Contributor
  • ***
  • Posts: 14297
  • Country: fr
Re: EEVblog #1160 - Weller Responds
« Reply #84 on: December 18, 2018, 05:38:45 pm »
These don't cost much more and require zero extra labor to install:


Well, if you go for quality parts, it can make a significant difference (and I'm willing to think that Weller uses quality parts at least). As an example, compare these two Schurter receptacles:
https://www.digikey.com/product-detail/en/schurter-inc/6100.4325/486-2196-ND/640558
https://www.digikey.com/product-detail/en/schurter-inc/4304.6015/486-3720-ND/2645616

Obviously you can find much cheaper IEC receptacles but they could cause other safety and reliability issues.
(Could be interesting if Dave could identify the manufacturer of the IEC plug Weller used to see if that could be the reason. I'm willing to believe Weller could have taken such a decision to save a couple bucks on their "low-end" soldering station line, as dubious as it is, but not for a couple cents...)
 
The following users thanked this post: oPossum

Offline nsd_c

  • Contributor
  • Posts: 36
Re: EEVblog #1160 - Weller Responds
« Reply #85 on: December 18, 2018, 06:04:55 pm »
So, TL;DR: Weller US branch moved operations to Mexico, probably laid off all US engineering staff. Weller German offices probably existed prior to this move and continued to exist to be able to sell Weller products to the European market. Their offices there designed new units for the European market, and those were ported to the US market slowly. Eventually someone high up decided to hand the reigns of the US Weller branch more or less fully over to the German branch.

Weller was founded in 1959 in Besigheim, Germany. It never was only an "office". Weller soldering tools were developed and (at least for the european market) manufactured in Besigheim, Germany until 2016, when manufacturing was moved to Mexico and 130 people were laid off. Weller claim that they still develop the soldering tools in Besigheim, Germany.

BTW: my 2014 Weller PU81 was made in Germany and has a 500mA slow blow primary fuse which is user-accessible. I bought another one last year, which was "Made in Mexico".

Sorry, I did not mean to insult Weller's presence in Germany as being in some way inferior to the US-based Weller offices. This is obviously not the case when you look at the significant degree of sophistication of the German-designed units produced in the past 15 years over the state of Weller's product line from ~2000.

That is saddening information about the lay-off.

I would like to point out one thing, though, which is that Weller was originally founded in the United States back in the 1940s. See for example, this marketing bit that I pulled from the Apex Tool Group website:



There is also this text on their website:

Quote from: Apex Tool Group
In the soldering industry, the name Weller® carries a lot of weight. Carl Weller patented the first hand-soldering tool to heat and cool rapidly in 1941. Weller Manufacturing Company was founded in 1945 as a family partnership near Philadelphia, Pennsylvania, USA.

Somewhere I have read (though I don't have time to find it now--perhaps later today) that Weller began operations in Germany because it was too difficult for the US offices to alter their products to European electrical safety specs from afar.

Also, copying this from a different thread (where I posted in by accident... whoops)

Quote from: me in the wrong thread


Going back to my earlier theories about design moving from Weller NA to Weller Germany, just look at the label on this unit... "Designed & Engineered in Germany" then "Made in Mexico." Keep in mind that this is the NA-variant.

What I would really like to know is, are the units which are intended for the European market, like the rest of the European Wellers, made in Germany. If this is the case, I wonder if there are differences in the design. My thought is that perhaps Weller in Germany designed the European version of this unit, then it was "ported" to the US market. And, who might have done that "port?" I wouldn't be surprised if that was a task given to Weller NA who, being apparently now a shell of a company, went the route that they did (i.e., no primary side fuse) without running that past the original designers in Germany.

So, my question would be, (a) where are the 230V units made and (b) do they have better protection?

Of course, paschulke2 seems to have answered the question to part (a), which is that prior to 2016 they would perhaps have been made in Germany, but now in Mexico. I would wonder then if there are differences between the pre/post 2016 versions of these. (if there is a pre-2016 version.)
 
The following users thanked this post: oPossum

Online Fungus

  • Super Contributor
  • ***
  • Posts: 16560
  • Country: 00
Re: EEVblog #1160 - Weller Responds
« Reply #86 on: December 18, 2018, 06:12:25 pm »
Well, if you go for quality parts, it can make a significant difference (and I'm willing to think that Weller uses quality parts at least). As an example, compare these two Schurter receptacles:
https://www.digikey.com/product-detail/en/schurter-inc/6100.4325/486-2196-ND/640558
https://www.digikey.com/product-detail/en/schurter-inc/4304.6015/486-3720-ND/2645616

I'm not an expert on these things but I found this on digikey:

https://www.digikey.com/product-detail/en/qualtek/723W-X2-04/Q206-ND/245547

I believe Qualtek is an American company, are they rubbish?

Obviously you can find much cheaper IEC receptacles but they could cause other safety and reliability issues.

Such as? I don't recall one of those sockets ever failing.
 

Offline David Hess

  • Super Contributor
  • ***
  • Posts: 16545
  • Country: us
  • DavidH
Re: EEVblog #1160 - Weller Responds
« Reply #87 on: December 18, 2018, 07:18:52 pm »
Transformers can be designed to be "fusible" so no primary side fuse is required for safety and I assume that was the case here.  It is cheap but arguably safe since it is tested under adverse conditions.

Do their older low voltage soldering irons have primary side fuses?  I do not remember.

I always assumed that Weller was in the typical position (like Fluke and Tektronix) of having been purchased to extract the value of their name and reputation with declining quality and value of their capitol with debt.  For Weller this showed up in design changes to their products years ago and a marked decrease in quality.
 

Offline rhodges

  • Frequent Contributor
  • **
  • Posts: 300
  • Country: us
  • Available for embedded projects.
    • My public libraries, code samples, and projects for STM8.
Re: EEVblog #1160 - Weller Responds
« Reply #88 on: December 18, 2018, 07:27:59 pm »
Even if a response from Engineering was drafted and passed to Corporate Communications for review, I can easily imagine they would not understand what the engineers said and would toss it out of fear and ignorance.
A little off topic here...
Over the years, I have heard the "facts of life" that at some point, I will have to leave my field (software) and go into management. I did not really like that. I LIKE programming! Can't a good worker stay in his field forever?

I think this is a good reason why the skilled workers SHOULD be promoted into management positions.

Back on topic...
When I was reading the comments about fuse size for 120v versus 240v, my first thought was: Why not select a MOV suitable for 120v and put that behind the fuse? Wouldn't that buy enough time to blow the fuse before the transformer smoked? I am not a transformer guy, but my second thought was: Wouldn't the transformer saturate (with 240v), and blow the fuse quickly?
Currently developing STM8 and STM32. Past includes 6809, Z80, 8086, PIC, MIPS, PNX1302, and some 8748 and 6805. Check out my public code on github. https://github.com/unfrozen
 

Online tszaboo

  • Super Contributor
  • ***
  • Posts: 7307
  • Country: nl
  • Current job: ATEX product design
Re: EEVblog #1160 - Weller Responds
« Reply #89 on: December 18, 2018, 07:28:43 pm »
Turns out, you cannot replace a primary side fuse with some printing on the label.
BTW for future reference for everyone:
CE approval <- not a thing
 

Offline In Vacuo Veritas

  • Frequent Contributor
  • **
  • !
  • Posts: 320
  • Country: ca
  • I like vacuum tubes. Electrons exist, holes don't.
Re: EEVblog #1160 - Weller Responds
« Reply #90 on: December 18, 2018, 08:04:36 pm »
Was never too impressed with Weller. Seem poorly built and not very powerful.
 

Offline metrologist

  • Super Contributor
  • ***
  • Posts: 2199
  • Country: 00
Re: EEVblog #1160 - Weller Responds
« Reply #91 on: December 18, 2018, 08:30:56 pm »
BTW for future reference for everyone:
CE approval <- not a thing

Since my company complies, CE is everything...
 

Offline floobydust

  • Super Contributor
  • ***
  • Posts: 6923
  • Country: ca
Re: EEVblog #1160 - Weller Responds
« Reply #92 on: December 18, 2018, 08:33:07 pm »
my entire response from Weller engineering department:
"The WE 1010NA is UL and cUL approved and fulfill the UL standards according “UL 499- Standard for Safety Electric Heating Appliances”. That is and was the base to release this product for sales in NA (USA and Canada).

The WE 1010(230V) for the European market is manufactured according the CE directive and fulfill the safety Standard according DIN EN 60335-1 and DIN EN 600335-2-45. "


UL 499 is an antique safety standard from an era where soldering irons were just a power cord and a handle with heater. Older versions of the standard relied on the mains breaker for protection against mains faults.

But here we have a power transformer (component) which can fail partial shorts (shorted turn on primary or secondary) which is not a dead short but rather a fire hazard as the transformer draws high current and heats up. There are ways to heat up a transformer to burn up and catch fire.
This failure mode a certifier will assess by overloading or shorting the transformer secondary, to see if that component failing makes a hazard.

Your home stereo, wall warts, clock radio etc. consumer electronics all require a primary fuse of some sort in the power transformer.
Seeing that fuse on Hakko and other Weller products, Metcal etc. is common sense - but too bad the politics of a fuse are at play.
 
The following users thanked this post: SeanB, thm_w, TheDane

Online tszaboo

  • Super Contributor
  • ***
  • Posts: 7307
  • Country: nl
  • Current job: ATEX product design
Re: EEVblog #1160 - Weller Responds
« Reply #93 on: December 18, 2018, 08:48:07 pm »
BTW for future reference for everyone:
CE approval <- not a thing

Since my company complies, CE is everything...
CE is only declaration of conformity. You (or a notified body in some case) declares that it confirms the law.
"Approval" means (for example) that the product got checked that it can be placed on the market.
Two very different thing, with different liability and different procedures.
 

Offline David Hess

  • Super Contributor
  • ***
  • Posts: 16545
  • Country: us
  • DavidH
Re: EEVblog #1160 - Weller Responds
« Reply #94 on: December 18, 2018, 08:59:03 pm »
A little off topic here...
Over the years, I have heard the "facts of life" that at some point, I will have to leave my field (software) and go into management. I did not really like that. I LIKE programming! Can't a good worker stay in his field forever?

Some organizations decouple pay from position.  Rank then depends on who you manage and who manages you.

Quote
I think this is a good reason why the skilled workers SHOULD be promoted into management positions.

Some skilled workers are just not suitable for management on a larger scale.

Quote
When I was reading the comments about fuse size for 120v versus 240v, my first thought was: Why not select a MOV suitable for 120v and put that behind the fuse? Wouldn't that buy enough time to blow the fuse before the transformer smoked? I am not a transformer guy, but my second thought was: Wouldn't the transformer saturate (with 240v), and blow the fuse quickly?

I can tell you right now from personal experience that using a MOV this way is a bad idea.  We had a batch of low voltage MOVs somehow get mixed into production with results better imagined than witnessed; the fuses did not blow and some undergarments needed to be changed.
« Last Edit: December 18, 2018, 09:00:59 pm by David Hess »
 

Offline Bud

  • Super Contributor
  • ***
  • Posts: 6877
  • Country: ca
Re: EEVblog #1160 - Weller Responds
« Reply #95 on: December 18, 2018, 09:01:31 pm »
Was never too impressed with Weller. Seem poorly built and not very powerful.

You can only pry my 25 years old Weller from my cold dead hands. Very robust, plenty of power and the newer JBC looks a toddlers toy against it.
Facebook-free life and Rigol-free shack.
 

Offline EEVblogTopic starter

  • Administrator
  • *****
  • Posts: 37661
  • Country: au
    • EEVblog
Re: EEVblog #1160 - Weller Responds
« Reply #96 on: December 18, 2018, 09:31:23 pm »
Comment from Youtube:
Can anyone confirm?



 

Offline EEVblogTopic starter

  • Administrator
  • *****
  • Posts: 37661
  • Country: au
    • EEVblog
Re: EEVblog #1160 - Weller Responds
« Reply #97 on: December 18, 2018, 09:33:30 pm »
Put in a thermal fuse in the transformer and achieve the same end with out burning down the owners home/work.

Would it respond fast enough? Dave said this went up in seconds.

It was literally seconds. If I hadn't pulled the plug and tossed the unit in a box to trap the smoke, the building would have been evacuated and the fire brigade would have been on their way.
 

Offline EEVblogTopic starter

  • Administrator
  • *****
  • Posts: 37661
  • Country: au
    • EEVblog
Re: EEVblog #1160 - Weller Responds
« Reply #98 on: December 18, 2018, 09:36:22 pm »
At the primary side, they would have had to use either a mains socket with a built-in fuse holder (which are significantly more expensive)

I doubt it, not at the volumes Weller would be dealing with and likely use across multiple items.
 

Offline blacksheeplogic

  • Frequent Contributor
  • **
  • Posts: 532
  • Country: nz
Re: EEVblog #1160 - Weller Responds
« Reply #99 on: December 18, 2018, 09:37:08 pm »
I always assumed that Weller was in the typical position (like Fluke and Tektronix) of having been purchased to extract the value of their name and reputation with declining quality and value of their capitol with debt.  For Weller this showed up in design changes to their products years ago and a marked decrease in quality.

I have a WHA3000P, there is nothing cheaply made about it but my WX2D not the same quality but it's still not bottom of the barrel. The biggest change I noticed was the quality of TIPs from Mexico, for a while XNT tips from Mexico were disposable after first use although that problem seems to have been fixed.
 


Share me

Digg  Facebook  SlashDot  Delicious  Technorati  Twitter  Google  Yahoo
Smf