Hi Brucehoult,
Thanks for the reply.
I should have mentioned some more info: I have a 24v system. Too much money/time to go over to 48v
Have a 60A and a 50A solar controllers (Roof 60A - Shed 50A). NONE every go the max, except on a huge Summer high UV day.
These feed two Lipo4 battery banks, which then go into a 5Kw (Continuous), PSW invertor, into the house.
With the suns crossing these 'new' panels facing East (roof faces N, Shed faces W), the distribution of Sun Solar Rays would be fairly evened out.
Objective would be to have the Solar Controllers at 75% through the day.
I didn't intend to use the MC4's I was going to strip them off. The cable on the panels is 6AWG. AFIAK a MC4 at 37v is rated to 30A.
I can get 4 into 1 adaptors. So pondering the run from 4 panels (adaptor length before the 'join', is approx 2mtrs. Then snip the MC4's off the ends of that adaptor...

But I was hoping to have the least amount of connections/losses as possible.
I did look at putting them in series as you say, but I would need to convert the 100's of DC Volts back down to 24v
Nice and easy using the existing MC4's. But then with 14 panels, I'd have to divvy them up.
If i did look at 12panels, which way would you go (3x4, 4x3, 6x2)?
Stil got to go from those V's to 30v's for the controllers...
That Pecron E1500LFP is a nice piece of kit. AUS $2700 is probably a fair price, but I only need the Panel feed going into my existing setup.
With the parallel run though using those adaptors (can get 2 way as well), I'd only need to start off 'thin' at the far side and then go thicker as I got to shed wouldn't' I ?

That's why I thought of the panels going into Bus Bars at the end of the sheds, then use super thick to the Battery Shed.
That 6mm Twin and Earth 6mm² using all 3 cores for a single Pos or Neg would be 18mm²
Funny. Got the panels free. Got the room to fit them. But looking at $1000 to just cable it

Humm....