Very long lead times on a lot of products on Digikey
« on: March 26, 2020, 06:16:06 pm »
First it was the pcb manufacturing that was affected by the Corona Virus, now I am noticing that a lot of products that I use that I am trying to restock on is out of stock with months long restock lead time. Other alternative parts are much more expensive.

Anyone else having these same issues?
 

Offline rfdave#gmail.com

  • Contributor
  • Posts: 37
  • Country: us
Re: Very long lead times on a lot of products on Digikey
« Reply #1 on: March 27, 2020, 02:29:14 am »
Nope, I'm still getting my hand delivered packages daily, along with Fresh coffee  :-DD :-DD :-DD
 

Offline T3sl4co1l

  • Super Contributor
  • ***
  • Posts: 22436
  • Country: us
  • Expert, Analog Electronics, PCB Layout, EMC
    • Seven Transistor Labs
Re: Very long lead times on a lot of products on Digikey
« Reply #2 on: March 27, 2020, 03:32:51 am »
Well yeah, the factories are shutting for, *checks watch on the pandemic*, a few months probably? :P  Make do with whatever substitutes you can, alternate suppliers, stock, etc.  It's not going to be business as usual.  Just chill out, roll with it, and if applicable, notify customers of delays as needed.  If you're low on cash, relief should be coming.

Tim
Seven Transistor Labs, LLC
Electronic design, from concept to prototype.
Bringing a project to life?  Send me a message!
 


Share me

Digg  Facebook  SlashDot  Delicious  Technorati  Twitter  Google  Yahoo
Smf