Products > Test Equipment
Advantest R6871E-DC 6.5digit DMM Overview/Teardown
<< < (4/4)
DavidKo:
I know it is quite late answer, but I expect that you need only rewire the cables on the white thing in rectangle. You can measure voltages upfront (I use autotransformer for that) to see the voltages between each pairs. I my switching unit are two gray cables with 3 wires connected in parallel (if I remember that correctly it was white and red). I had used the ve7xen picture for example.
Navigation
Message Index
Previous page
There was an error while thanking
Thanking...

Go to full version
Powered by SMFPacks Advanced Attachments Uploader Mod