Yes the American Fluke did their best , I recognize this and with proofs ...
They had send the specific 28II from USA to Fluke Europe ... just for me .
This DMM got packaged in the box before two weeks !! or less ..
(15/9/2010 ) and today we have 7/10/2010 .. ten days was traveling around, so its just 10 days old from the production line to the end customer .
Well I like to thanks you Dave publicly for once more time , for all the help .
About calling your neighbors
Fluke Australia ..
I also need to thanks the Senior Support Engineer at Fluke Everett Washington ,
he is a man that you can speak freely for anything, and this is because he is an technician too,
so there is an common base and language , about understanding .
( I will contact him and personally by email)
That's it .. I got an happy end , and now what stays for all of you , are the gathered information.
Use it wisely and protect your 87-5 from high expose to GSM .
If I did not had bricked my , this is what I would do too ...
I would look after it and for the GSM issue , as I was look after it, so to not drop down , or keeping the screen safe from scratches .... and all this common babysit that we do at anything expensive.
Good luck to all Kiriakos ..
.