Back in, er, can't remember but it was 3-day week time in the UK, we created schematics using pen, ink and paper on pukka drawing boards (and PCB layouts using tape on film). You can imagine that the potential for mistakes was quite high. Being a contract house, it was important that everything we released was error free.
So, the way we checked stuff was to have two guys working together, one on the schematic and t'other on the layout. The schematic guy would call out some track endpoint (device or connector pin) and the layout guy would then trace that track and call out whatever it connected to. The schematic guy would highlight (on a copy print, obvs) those connections as they are called out. A bad connection would be one that didn't exist on the schematic, and at the end all the schematic tracks should be highlighted. Each chap would check the tracking or drawing as they're ticking stuff off, so every single segment got checked along the way.
It didn't take too long to do this and was very effective.
And then computer systems got to be affordable and couldn't make mistakes, so that practice fell out of favour. You can hand over a design to a colleague for perusal, but he's not going to made to look at every track as he would be the old way, so there's stuff he'll probably miss. Still, you know it'll pass the ERC and such like.