UK gang!!!!
What are you waiting for???
https://www.eevblog.com/forum/buysellwanted/fs-tdk-lambda-gen-60-55-0-60v-dc-0-55-a-3-3-kw-power-supply/new/#new
A three phase supply........
PS:-Chrysler had a penchant for recycling model names, so the Aussie Charger shares its name with the Dodge car of the same name, & very little else. The Dodge is a bit more urbane, & not quite so "hardcore" as the Oz one!
Words fail me, blithering idiots.
https://twitter.com/i/status/1547246036523048962
Words fail me, blithering idiots.
https://twitter.com/i/status/1547246036523048962
Reminds me of this thread at times ...
Words fail me, blithering idiots.
https://twitter.com/i/status/1547246036523048962
Reminds me of this thread at times ...
Yes we've been drowning in mud mostly today. In a moment of delirium caused by an hour of JIRA ticket shuffling earlier I decided I'm not talking about anything other than TE on here any more. Cars, computers, politics, crazy people, dick swinging, petty arguments can fuck off. They detract from the good things in life like scopes, signal sources and that bacon smell when you solder your fingers to something.
<snip>
Is it wrong of me that my nickname for "Twitter" is "Twatter"?
Please will you two stop it, AVGresponding and mnementh, yes it is extremely hot and peoples fuses are shortened as a result, this is not normal behaviour and you both know this to be true. If we keep on this current tack there is a good chance that we will be heavily monitored and that will effect almost everyone here negatively as we would not be able to deviate of the core topic and that truly would be a backward step.
So please, make it up and lets move forwards.
Words fail me, blithering idiots.
https://twitter.com/i/status/1547246036523048962
Reminds me of this thread at times ...
Yes we've been drowning in mud mostly today. In a moment of delirium caused by an hour of JIRA ticket shuffling earlier I decided I'm not talking about anything other than TE on here any more. Cars, computers, politics, crazy people, dick swinging, petty arguments can fuck off. They detract from the good things in life like scopes, signal sources and that bacon smell when you solder your fingers to something.
And on that note, still arguing with test-equip over this ROM. I have decided that life is too short for this crap, have opened a claim and am working out how to burn 74S267's at the moment and will load the damn code in myself.
To do this I figure the best approach is to read the existing ROM out first and validating that I've got as much as I can out of it. I'm down one address pin but I worked out that if I read it and assume that's 0 then I can at least validate half my burned ROM's address space is fine. I am now attempting to do the following:
1. Order some bits. Have a medium shopping list.
2. Use a cheap arse arduino clone to read the ROM out into PC and diff it with the one I have to validate I reverse engineered it properly.
3. Add some switching magic for the burn voltages and an external power supply to burn the new ROM. Check it carefully with a scope.
4. Burn new ROM and validate.
If that doesn't work, you can always just glue some gears on it and call it SteamPunk; it's already got that industrial-revolution-era patina.
mnem
No mercy; no regrets.
Brilliant!! That gives me a great idea!
Behold!!!
<runs for cover>
-Pat
UK gang!!!!
What are you waiting for???
https://www.eevblog.com/forum/buysellwanted/fs-tdk-lambda-gen-60-55-0-60v-dc-0-55-a-3-3-kw-power-supply/new/#new
A three phase supply........
Even in Italy I have 3PH 380VAC... Germany did a wonderful job in wiring up their grid. The three phases there are almost everywhere.
I would like to buy it a play with a 220VAC to 3phases 380VAC VFD... if I would be in UK.
Not trying to push it, I am so surprised it is still dancing for sale and nobody has bought it already.
Me too, or +1, or is that just too Eternal September?
<snip>
Fucking amen. Something I've tried to encourage but then I get dog piled for trying to direct the thread to my own selfish needs which is completely untrue.
And since I have no time today to work on the 465B re-cap this mostly likely will be my one and only post.
Finally......you notice then whenever this thread goes off the rails it's always the same common denominator?
...Looked in again (Amazon Prime Day), found this UNI-T UTi120S IR Camera...
Sub-$200 for a 120x90 IR Resolution model seems too good to be true; that's almost usable resolution for our kind of troubleshooting. What's the gotcha? Something horrible, like it's really inaccurate, or 2 seconds per frame update...?
mnem
*toddles off to do a Time Machine on his MacPro*
It's a rebadged (and re-coloured) HTi HT-04 which you can normally buy for even less. The refresh rate is 6Hz by the way.
McBryce.
UK gang!!!!
What are you waiting for???
https://www.eevblog.com/forum/buysellwanted/fs-tdk-lambda-gen-60-55-0-60v-dc-0-55-a-3-3-kw-power-supply/new/#new
A three phase supply........
Even in Italy I have 3PH 380VAC... Germany did a wonderful job in wiring up their grid. The three phases there are almost everywhere.
I would like to buy it a play with a 220VAC to 3phases 380VAC VFD... if I would be in UK.
Not trying to push it, I am so surprised it is still dancing for sale and nobody has bought it already.
The three phase is what kills interest in it. You just won't see a three phase installation anywhere in the UK where the demand is for less than ~125A single phase. It's just how the power company has always done it. Three phase installations outside of industry or large buildings are very rarely seen. It costs a small fortune to get a three phase supply installed anywhere that wasn't planned with a 3 phase supply ab initio. It almost always entails significant streetworks (of the digging variety) which puts a several thousand pound price tag on even the most trivial work.
TEA
Anyone in UK @BD139 want a thermal TRMS meter?
www.ebay.co.uk/itm/403774543294
Already seen it. At that price, no
I am after a decent 3400A but the other seller who had one didn’t want to shift it at the price I wanted to pay. I can afford to wait
You may well be right, istr the last stuff made here was the Vivaro van, and they maybe did announce its imminent demise/offshoring. Bloody scandalous is the murder of our car manufacturing industry.
Most of it actually deserved it.Ouch, that hurts. We did at one time have an industry that was highly prized, but we got complacent and let the world overtake us instead of making them play catchup.
There is 3 phase in the street but not in the house. If I could get an extension lead from two neigbours I'd be set though
EV's and non-gas heating is driving three phase supplies for some new build housing though.